Skip to main content

19th June 2013

Summer Shutdown? Optimize Your Warehouse

Summer Shutdown? Optimize Your Warehouse

Optimize Your Warehouse

Summer shutdown approaching. Plans to optimize your warehouse, Factory or outlet?  The traditional two week holiday known as Factory Fortnight will soon be upon us and you may be planning the traditional plant shutdown during this time. If so why have all those little niggling repairs to your racking completed whilst your staff are not around?

Why not have any planned pallet racking installed whilst there would be minimum disruption to your daily schedules and work flow or why not have all those pedestrian and safety barriers installed that you have been considering all year round?

We at Advanced Handling & Storage Ltd do not shut down and this enables us to provide a service second to none.

We can come into your business and complete all works required without disruption to your daily practice.  So what you waiting for call us now on 0800 345 7088….we are waiting to take your call.

  • Link 51
  • Dexion
  • Redirack
  • Planned Storage Systems
  • HiLo Rack plan
  • Apex
  • Premier Rack
  • Decking
  • Troax
  • Support bars
  • Mezzanine Floors
  • Office Partitioning

Get in Touch with Advanced Handling & Storage

If you are interested in a warehouse racking system, please call us on 0800 345 7088 or email [email protected]

0
    0
    Your Basket
    Your basket is emptyReturn to Shop